This project involves the engineering integration of cooling towers and evaporative condensers into a facility’s Condenser Water (CW) and Refrigerant (REF) circuits. The scope includes process design, piping integration, and compliance qualification as per ASME B31.1/B31.3/B31.5 piping codes. The objective is to ensure safe, efficient heat rejection performance while meeting all regulatory and mechanical design requirements.

Project Activities

  1. Requirement & Data Collection
  2. Process & Mechanical Design
  3. ASME Code Compliance (B31.1/B31.3/B31.5)
  4. Fabrication & Construction Package
  5. Testing & Commissioning & Documentation & Handover